Supplier of Bordeaux Métropole
Cobat
Cobat holds one public contract awarded by Bordeaux Métropole in 2022. That is 2% of the value of the contracts the intercommunality awarded in 2022.
€4M
at most, over the whole term of the contracts awarded by Bordeaux Métropole in 2022
Its contracts in Bordeaux Métropole
Maximum amount of each contract, over its whole term: not what was paid.
Construction du groupe scolaire Les Aubiers à Bordeaux/Structure · Gros oeuvre · 2022 · maximum over 18 months · at most ~€2.6M a year on average · Open tender€4M