Skip to main content

Public contracts of Communauté d'agglomération de Nîmes Métropole · 2023

Construction d’une chambre de Vanne pour la pose d’une Vanne sur conduite AEP dn 1000 mm

€653k
maximum contract amount over 9 months — what was paid on it is not published
Signed on 13 April 2023 · ended around January 2024 · 9 months

Company selected

Sade - Compagnie Générale de Travaux HydrauliquesConstruction de réseaux pour fluides · registered office Paris (75014) · headcount 2,000 to 4,999 employees · SIREN 562077503

A contract awarded to 2 holders; above, the main holder. With it: Razel-BEC. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 40 by amount of the 142 contracts Communauté d'agglomération de Nîmes Métropole published for 2023.

Other contracts of Sade - Compagnie Générale de Travaux Hydrauliques in Communauté d'agglomération de Nîmes Métropole

Travaux gpt razel bec-sade2025 · maximum over 12 months6.3€MTravaux gpt razel bec-sade2024 · maximum over 19 months6.8€MTravaux gpt razel bec sade2023 · maximum over 12 months1.6€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.