Skip to main content

Public contracts of Communauté d'agglomération de Nîmes Métropole · 2023

Travaux de protection du captage

Générac

€3.7M
maximum contract amount over 20 months — what was paid on it is not published
Signed on 12 September 2023 · ended around May 2025 · 20 months

That is at most ~€2.2M a year on average: a maximum too.

Company selected

Société Braja Vesigne (Lautier Moussac)Construction de routes et autoroutes · registered office Orange (84100) · headcount 250 to 499 employees · SIREN 319755823

A contract awarded to 6 holders; above, the main holder. With it: Cevenole Aménagement Infras Construction, Saur, PRO.G+, SARL JP Industrie (Groupe Eliene), Cevennes B.T.P.. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 11 by amount of the 143 contracts Communauté d'agglomération de Nîmes Métropole published for 2023.

Other contracts of Société Braja Vesigne (Lautier Moussac) in Communauté d'agglomération de Nîmes Métropole

Réhabilitation de la plateforme de compostage de la station de…2026 · maximum over 5 months1.2€MEntretien et réfection de l’espace public des ZAE de nm2025 · maximum over 4 years6€MEntretien et réfection de l’espace public des zones d’activités…2025 · maximum over 4 years3€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.