Skip to main content

Public contracts of Communauté d'agglomération du Bassin d'Aurillac · 2020

Réhabilitation des réseaux Adduction Eau Potable, d’Eaux Usées, d’eaux pluviales et enfouissement réseaux secs, Velzic

€384k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 10 September 2020 · ended around March 2021 · 6 months

Company selected

Stap 15Construction de réseaux pour fluides · registered office Naucelles (15250) · headcount 10 to 19 employees · SIREN 394292098

Number 3 by amount of the 45 contracts Communauté d'agglomération du Bassin d'Aurillac published for 2020.

Other contracts of Stap 15 in Communauté d'agglomération du Bassin d'Aurillac

Aurillac2021 · maximum over 2 months286€kTravaux de réhabilitation de branchements plomb2021 · maximum over 12 months150€kAurillac2021 · maximum over 1 month68€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.