Public contracts of Communauté d'agglomération du Grand Annecy · 2019

Rénovation du système de production d’eau potable de l’usine de la tour

Phase 2

€4.3M
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 27 March 2019 · ended around September 2021 · 2.5 yrs

That is at most ~€1.7M a year on average: a maximum too.

Who won it

Entreprise MauroTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Motte-Servolex (73290) · headcount 50 to 99 employees · SIREN 311676910

A contract awarded to 4 holders; above, the main holder. With it: Perrin Electric, Cabinet d'Études Marc Merlin, Degremont France Assainissement. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 90 contracts Communauté d'agglomération du Grand Annecy published for 2019.

Other contracts of Entreprise Mauro in Communauté d'agglomération du Grand Annecy

Création d’une unité d’ultrafiltration sur la commune déléguée de…2025 · maximum over 13 months1.8€MRenouvellement des équipements d’ultrafiltration de l’usine de…2023 · maximum over 2.5 years8.2€MStation des rebattes2021 · maximum over 19 months209€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.