
Jura · Bourgogne-Franche-Comté · 35,895 residents · Chair: Michel Fischer
Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération)
€31.5 million spent in 2025.
€878 per resident · Urban-area groupings of the same size: €896
What Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération) spends, by policy
The 4 other items (4%)
Source: 2025 accounts of Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération) (DGFiP), by public policy.
Suppliers and recipients
The same €31.5M, by recipient.
Source: 2025 accounts of Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération) (DGFiP).
- Eiffage Route Centre Est (Bourgogne Franche Comte)3 contracts€4.3M
- J.C. Bonnefoy3 contracts€3.8M
- Biodepe4 contracts€1.1M
- Entreprise Bonglet€1.1M
- Études Installation Maintenance Industri€967k
- Scirpe Centre Est Société de Conception Ingenierie et Realisation pour l Epuration€729k
- Eiffage Énergie Systemes - Infrastructures Est4 contracts€382k
75 contracts signed in 2025 · €15.3M before tax
Why this total differs from the €13.1M paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€8.3M of capital spending in 2025 (building, renovation, equipment), €230 per resident. Urban-area groupings of the same size: €163.
- Travaux de rénovation énergétique du Ges Cosec de Lons-le-Saunier2025 · Entreprise Bonglet€1.1M
- Travaux de construction d’une cité des sports2024 · 6 companies€881k
- Construction de la station de traitement des eaux usées2025 · Scirpe Centre Est Société de Conception Ingenierie et Realisation pour l Epuration€729k
- Travaux d’amélioration du système épuratoire de la station de Trenal2024 · Petitjean T.P.€729k
- Travaux de construction de la station d’épuration du bourg de Pannessières2023 · Établissements Bernard Bugada et Compagnie€693k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
On top of that, €72k paid to other bodies for their own equipment (towns, intercommunalities, associations…).
Source: 2025 accounts of Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération) (DGFiP), by public policy.
Revenue and financing
Revenue: €28.5M · borrowing: €1.5M · spending: €31.5M.
Source: OFGL, 2025 accounts of the main budget.
Debt and taxes
€631 of debt per resident
Urban-area groupings of the same size: €498
2.9 years of savings to repay it
€87 of local taxes per resident
Urban-area groupings of the same size: €89
2025 accounts. Debt and taxes: OFGL, consolidated (main and side budgets). Per resident: amount divided by the population (Insee). “Urban-area groupings of the same size”: median of the 18 urban-area groupings of 28,000 to 49,000 residents.
The levels above Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération)
Spending per resident in 2025, and what each level pays for.
- IntercommunalityCommunauté d'agglomération ECLA (Espace Communautaire Lons Agglomération)Waste, water, urban transport, economic development€878
- DépartementJuraMinimum income, elderly and disability care, middle schools, county roads€1,375
- RegionBourgogne-Franche-ComtéHigh schools, regional trains, training, business support€612
Each row: the body’s own spending per resident, the figure at the top of its page (DGFiP). Not to be added up: a grant from one level is spent by another.
Who is part of Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération)
Understanding these figures
Who does what
The intercommunality collects and treats waste, often runs water and sanitation, organises urban transport, and pays part of its revenue back to its member towns.
Why the levels are not added up
The same euro can appear twice: once when a region or a département pays a grant, again when the town spends it. Each page shows its own body’s spending.
Where these figures come from
Spending: the accounts of the main budget published by the DGFiP, by public policy. Revenue, debt and taxes: OFGL. Contracts: published contract data (DECP), amounts planned at signing.
Do you work for Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération), or sit on its council? A figure to correct, context to add: write to us.
Page edited by Qipu, independent of Communauté d'agglomération ECLA (Espace Communautaire Lons Agglomération) · Sources and method
Accounts 2025 (DGFiP, OFGL). The method · See the source