Skip to main content

Public contracts of Communauté d'agglomération Mont-Saint-Michel-Normandie · 2023

Création de réseaux de transfert et construction de la nouvelle station d’épuration de Ducey, Poilley et Saint Quentin sur le Homme

Station : construction de la nouvelle station d’ép

€2.2M
maximum contract amount over 15 months — what was paid on it is not published
Signed on 27 March 2023 · ended around June 2024 · 15 months

That is at most ~€1.8M a year on average: a maximum too.

Who won it

SaurCaptage, traitement et distribution d'eau · registered office Issy-Les-Moulineaux (92130) · headcount 5,000 to 9,999 employees · SIREN 339379984

A contract awarded to 3 holders; above, the main holder. With it: Manhave, Vauban GC. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 6 by amount of the 92 contracts Communauté d'agglomération Mont-Saint-Michel-Normandie published for 2023.

Other contracts of Saur in Communauté d'agglomération Mont-Saint-Michel-Normandie

Remplacement 4 armoires électriques2025 · maximum over 2 months42€kÉtudes périmètre epandage et trx curage des boues systèmes…2024 · maximum over 3 years2.4€MÉtudes de périmètre d’épandage et travaux de curage des boues…2024 · maximum over 3 years1.2€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.