Skip to main content

Public contracts of Communauté d'agglomération Montargoise et Rives du Loing (AME) · 2024

Maîtrise d’oeuvre pour les travaux de création de poste d

€52k
maximum contract amount over 21 months — what was paid on it is not published
Signed on 22 March 2024 · ended around December 2025 · 21 months

That is at most ~€30k a year on average: a maximum too.

Who won it

E'Nergys (H3C-Energies, Up, Utilities Performance)Ingénierie, études techniques · registered office Strasbourg (67200) · headcount 100 to 199 employees · SIREN 477913487

A contract awarded to 2 holders; above, the main holder. With it: Archymed. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 38 by amount of the 58 contracts Communauté d'agglomération Montargoise et Rives du Loing (AME) published for 2024.

Other contracts of E'Nergys (H3C-Energies, Up, Utilities Performance) in Communauté d'agglomération Montargoise et Rives du Loing (AME)

Maîtrise d’oeuvre pour les travaux de création de poste de refoulement…2024 · maximum over 21 months30€kMaîtrise d’oeuvre pour les travaux de réhabilitation du génie civil des…2022 · maximum over 2 years10€kMaîtrise d’oeuvre pour les travaux de réhabilitation du système de…2022 · maximum over 20 months7€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.