Maîtrise d’oeuvre pour l’étude et la création du tronçon SUD de l’itinéraire prioritaire n° 2 du Schéma directeur Vélo
That is at most ~€95k a year on average: a maximum too.
Who won it
Ingc Ingenierie ConstructionIngénierie, études techniques · registered office Auch (32000) · headcount 6 to 9 employees · SIREN 352786891A contract awarded to 2 holders; above, the main holder. With it: Dci Environnement. The amount is the whole contract’s: the DECP does not publish each holder’s share.
The competition
Median for this procedure in 2024: 3 bids, across 48385 comparable contracts. Simplified procedure · awarded to 2 companies
Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.
Number 54 by amount of the 96 contracts Communauté d'agglomération Montluçon Communauté published for 2024.
Other contracts of Ingc Ingenierie Construction in Communauté d'agglomération Montluçon Communauté
Maîtrise d’oeuvre et études environnementales…2024 · maximum over 3.5 years413€kMaîtrise d’oeuvre et etudes environnementales…2024 · maximum over 3.5 years248€kMaîtrise d’oeuvre pour l’etude et la création du tronçon sud de…2024 · maximum over 15 months113€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : none
Subcontracting declared : no