Public contracts of Communauté d'agglomération Moulins Communauté · 2019

Travaux de réhabilitation en passerelle piétonne d’un ouvrage ferroviaire

Structure

€3.3M
maximum contract amount over 14 months — what was paid on it is not published
Signed on 18 April 2019 · ended around June 2020 · 14 months

That is at most ~€2.8M a year on average: a maximum too.

Who won it

Constructions Metalliques BourbonnaisesFabrication de structures métalliques et de parties de structures · registered office Saint-Gerand-De-Vaux (03340) · headcount 50 to 99 employees · SIREN 494525702

The largest of the 46 contracts Communauté d'agglomération Moulins Communauté published for 2019.

Other contracts of Constructions Metalliques Bourbonnaises in Communauté d'agglomération Moulins Communauté

Réhabilitation des services techniques2025 · maximum over 7 months45€kParc des expositions2024 · maximum over 1 month117€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.