Skip to main content

Public contracts of Communauté d'agglomération Saumur Val de Loire · 2020

Création d’un poste de refoulement d’eaux usées rue Providence au Puy Notre-Dame

€57k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 8 September 2020 · ended around January 2021 · 4 months

Company selected

SAS Noria-Conception-HydrauliqueConstruction de réseaux pour fluides · registered office Les Brouzils (85260) · headcount 6 to 9 employees · SIREN 828792002

Number 33 by amount of the 62 contracts Communauté d'agglomération Saumur Val de Loire published for 2020.

Other contracts of SAS Noria-Conception-Hydraulique in Communauté d'agglomération Saumur Val de Loire

Réhabilitation poste refoulement de la poterne2023 · maximum over 4 months179€kZA du Grand Bois à Allonnes2020 · maximum over 7 months113€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.