Skip to main content

Public contracts of Communauté d'agglomération Saumur Val de Loire · 2026

TRAVX réhabilitation espace verdun

Métallerie

€56k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 13 March 2026 · running until about July 2027 · 16 months
Ongoing13 Jul 2027

That is at most ~€42k a year on average: a maximum too.

Company selected

AdrionFabrication de structures métalliques et de parties de structures · registered office Maze-Milon (49140) · headcount 20 to 49 employees · SIREN 382435170

Number 41 by amount of the 54 contracts Communauté d'agglomération Saumur Val de Loire published for 2026.

Other contracts of Adrion in Communauté d'agglomération Saumur Val de Loire

Rénovation tribunes hippodrome verrie2025 · maximum over 13 months91€kTRAVX réno bâtiment tertiaire 5 place marc leclerc2024 · maximum over 12 months205€kSerrurerie2021 · maximum over 12 months152€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.