Skip to main content

Public contracts of Communauté de communes Baugeois Vallée · 2023

Réhabilitation pôle environnement bd entrepreneur beaufort

€192k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 24 October 2023 · ended around November 2024 · 13 months

That is at most ~€177k a year on average: a maximum too.

Company selected

Luc DurandConstruction de réseaux pour fluides · registered office Longuenee-En-Anjou (49220) · headcount 250 to 499 employees · SIREN 318845229

Number 11 by amount of the 48 contracts Communauté de communes Baugeois Vallée published for 2023.

Other contracts of Luc Durand in Communauté de communes Baugeois Vallée

Travaux terrassement reprofilage alveole a 21-mise en oeuvre couverture…2025 · maximum over 12 months83€kRenouvellement des réseaux d’assainissement des eaux usées a beaufort…2024 · maximum over 14 months1.2€MAménagement aire d’accueil des GENS du voyage beaufort2024 · maximum over 3 years750€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 8

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.