Supplier of Communauté de communes de l'Outre-Forêt
Forum de L Architecture
Forum de L Architecture holds 6 public contracts awarded by Communauté de communes de l'Outre-Forêt between 2022 and 2025. That is 9% of the value of the contracts the intercommunality awarded over the period.
€313k
at most, over the whole term of the contracts awarded by Communauté de communes de l'Outre-Forêt in 2025
Its contracts in Communauté de communes de l'Outre-Forêt
Maximum amount of each contract, over its whole term: not what was paid.
Maîtrise d’oeuvreConstruction d’une structure périscolaire a soultz sous forêts · 2025 · maximum over 3 years · at most ~€46k a year on average · Simplified procedure€140kMaîtrise d’oeuvreConstruction d’une crèche a soultz sous forêts · 2025 · maximum over 3 years · at most ~€36k a year on average · Simplified procedure€112kMaîtrise d’oeuvreConstruction d’un multi accueil a betschdorf · 2025 · maximum over 22 months · at most ~€33k a year on average · Simplified procedure€60kMaîtrise d’oeuvreConstruction d’une structure périscolaire a rittershoffen · 2024 · maximum over 2 years · at most ~€36k a year on average · Simplified procedure€78kMaîtrise d’oeuvreConstruction d’un pôle scolaire et périscolaire a hoffen · 2023 · maximum over 2.5 years · at most ~€80k a year on average€207kMaîtrise d’oeuvre pour la construction d’un groupe scolaire…2022 · maximum over 21 months · at most ~€123k a year on average€216kYear by year
€€216k in 2022 · €€313k in 2025
Click a year to see its amount.