Supplier of Communauté de communes de la Thiérache du Centre
Enrtec (Agri Watt)
Enrtec (Agri Watt) holds 2 public contracts awarded by Communauté de communes de la Thiérache du Centre between 2024 and 2026. That is 4% of the value of the contracts the intercommunality awarded over the period.
€292k
at most, over the whole term of the contracts awarded by Communauté de communes de la Thiérache du Centre in 2024
Its contracts in Communauté de communes de la Thiérache du Centre
Maximum amount of each contract, over its whole term: not what was paid.
Installation d’une centrale photovoltaïque pour la station de…2026 · maximum over 9 months · Simplified procedure€160kConstruction d’une déchetterie intercommunale…Hangar photovoltaïque · 2024 · maximum over 15 months · at most ~€233k a year on average · Simplified procedure€292kYear by year
2026€160 k
2024€292 k