Public contracts of Communauté de communes du Haut-Chablais · 2022
Maîtrise d’œuvre pour la construction d’une la crèche
That is at most ~€127k a year on average: a maximum too.
Who won it
Études de Structures et de Beton ArmeIngénierie, études techniques · registered office Thonon-Les-Bains (74200) · headcount 6 to 9 employees · SIREN 320840523A contract awarded to a consortium of 4 holders; above, the main holder. With it: Fournier-Mouthon Bureau d'Études, M'Architecte (Arc 74), Cabinet Uguet. The amount is the whole contract’s: the DECP does not publish each holder’s share.
The competition
Median for this procedure in 2022: 3 bids, across 2458 comparable contracts. Simplified procedure · awarded to 4 companies
Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.
Number 17 by amount of the 39 contracts Communauté de communes du Haut-Chablais published for 2022.
Other contracts of Études de Structures et de Beton Arme in Communauté de communes du Haut-Chablais
Maîtrise d’œuvre extension MSP de la Vallée du Brevon à Lullin2023 · maximum over 2 years48€kMaîtrise d’œuvre-Rénovation du camping de la Baume2022 · maximum over 2 years61€kMaîtrise doeuvre travaux de rénovation des vestiaires de football à…2021 · maximum over 2 years45€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.