Public contracts of Communauté de communes Sauer-Pechelbronn · 2022

Reconstruction et agrandissement de l’école maternelle

Construction d’un accueil périscolaire intercommunal de 100 places a hegeney · Bardage

€78k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 22 September 2022 · ended around November 2023 · 14 months

That is at most ~€67k a year on average: a maximum too.

Who won it

PK ConceptTravaux de couverture par éléments · registered office Forstheim (67580) · headcount 10 to 19 employees · SIREN 531469716

Number 28 by amount of the 58 contracts Communauté de communes Sauer-Pechelbronn published for 2022.

Other contracts of PK Concept in Communauté de communes Sauer-Pechelbronn

Site du fleckenstein : nouveau programme architectural…2026 · maximum over 8 months48€kSite du Fleckenstein : nouveau programme architectural…2026 · maximum over 12 months47€kTravaux d’aménagement sur un bâtiment existant à Preuschdorf2025 · maximum over 3 months22€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.