Conception réalisation pour la construction d’une chaufferie gaz secteur de grette brulard polygone

€4.1M
maximum contract amount over 19 months — what was paid on it is not published
Signed on 15 June 2026 · running until about January 2028 · 19 months
Ongoing14 Jan 2028

That is at most ~€2.6M a year on average: a maximum too.

Company selected

Études Installation Maintenance IndustriTravaux d'installation d'équipements thermiques et de climatisation · registered office Etupes (25460) · headcount 250 to 499 employees · SIREN 316113208

A contract awarded to a consortium of 6 holders; above, the main holder. With it: Groupe 1000, Eimi Elec, Solares Bauen, Donze Philippe, Santini Structurae Ingenierie. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 103 contracts Communauté urbaine Grand Besançon Métropole published for 2026.

Other contracts of Études Installation Maintenance Industri in Communauté urbaine Grand Besançon Métropole

GBB Travaux lot 16 Chauffage Ventilation Plomberie Sanitaires2024 · maximum over 3 years7.2€MTravaux d’entretien, de grosses réparations et de réaménagement…2024 · maximum over 4 years833€kTravaux d’entretien, de grosses réparations et de réaménagement…2024 · maximum over 4 years417€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.