Supplier of Communauté urbaine Le Mans Métropole
Vireo
Vireo holds one public contract awarded by Communauté urbaine Le Mans Métropole in 2026.
€128k
at most, over the whole term of the contracts awarded by Communauté urbaine Le Mans Métropole in 2026
What Vireo does in Communauté urbaine Le Mans Métropole
Maximum amount of each contract, over its whole term: not what was paid.
Mise en place, gestion et animation d’une plateforme territoriale de…Durée tranche ferme 4 ans · Durée tranche optionnelle 4 ans · 2026 · maximum over 8 years · at most ~€16k a year on average · Simplified procedure€128k