Skip to main content

Public contracts of Communauté urbaine Limoges Métropole · 2024

Construction d’un centre de ressources électronique, hyperfrequence et photonique (CREHP)

€370k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 4 November 2024 · ended around July 2026 · 20 months

That is at most ~€222k a year on average: a maximum too.

Who won it

SmacTravaux d'étanchéification · registered office Issy-Les-Moulineaux (92130) · headcount 2,000 to 4,999 employees · SIREN 682040837

Number 97 by amount of the 269 contracts Communauté urbaine Limoges Métropole published for 2024.

Other contracts of Smac in Communauté urbaine Limoges Métropole

Construction d’une patinoire communautaire2026 · maximum over 2 years1.7€MTravaux de réfection des façades du Zénith de Limoges2026 · maximum over 10 months1.2€MTravaux de réfection des façades du zénith de Limoges : lot bardage bois2026 · maximum over 10 months200€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 8

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.