Stelec
Stelec holds one public contract awarded by Dijon Métropole in 2025.
€35k
at most, over the whole term of the contracts awarded by Dijon Métropole in 2025
Its contracts in Dijon Métropole
Maximum amount of each contract, over its whole term: not what was paid.
Fourniture d’un moteur de tirage2025 · maximum over 6 months · Simplified procedure€35k