Genie Froid
Genie Froid holds one public contract awarded by Dijon Métropole in 2025.
€40k
at most, over the whole term of the contracts awarded by Dijon Métropole in 2025
Its contracts in Dijon Métropole
Maximum amount of each contract, over its whole term: not what was paid.
Fourniture, installation et raccordement d’un échangeur utilisé…2025 · maximum over 6 months · Simplified procedure€40k