Prossergy
Prossergy holds one public contract awarded by Dijon Métropole in 2025.
€15k
at most, over the whole term of the contracts awarded by Dijon Métropole in 2025
Its contracts in Dijon Métropole
Maximum amount of each contract, over its whole term: not what was paid.
Unité de valorisation énergétiqueRéalisation d’un audit et de propositions d’optimisation des… · 2025 · maximum over 7 months · Simplified procedure€15k