Public contracts of Métropole Rouen Normandie · 2020
Construction du centre de maintenance de bus pour la TAE à Caudebec Les Elbeuf
Who won it
Entreprise Cuiller FreresTravaux de menuiserie bois et PVC · registered office Petit-Couronne (76650) · headcount 100 to 199 employees · SIREN 710500562Number 110 by amount of the 140 contracts Métropole Rouen Normandie published for 2020.
Other contracts of Entreprise Cuiller Freres in Métropole Rouen Normandie
Construction des bâtiments du futur parc du champ des bruyères2019 · maximum over 18 months285€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.