Skip to main content

Public contracts of Métropole Toulon-Provence-Méditerranée · 2021

Étude de définition du schéma directeur métropolitain de gestion des eaux pluviales et de ruissellement

€2M
maximum contract amount over 4 years — what was paid on it is not published
Signed on 19 August 2021 · ended around August 2025 · 4 yrs

That is at most ~€507k a year on average: a maximum too.

Who won it

SafegeIngénierie, études techniques · registered office Nanterre (92000) · headcount 500 to 999 employees · SIREN 542021829

A contract awarded to 2 holders; above, the main holder. With it: Hydraul'Ic. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 14 by amount of the 155 contracts Métropole Toulon-Provence-Méditerranée published for 2021.

Other contracts of Safege in Métropole Toulon-Provence-Méditerranée

Maîtrise d’oeuvre partielle pour la réhabilitation de la capacité…2023 · maximum over 2 years125€kÉtudes de maîtrise d’oeuvre pour des travaux de sécurisation de la…2019 · maximum over 12 months142€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

The 2 lots : 1 €M · 992 €k

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.