Skip to main content

Public contracts of Montpellier Méditerranée Métropole · 2025

Construction d’un équipement de teleskis nautiques sur le site du parc gérard bruyère

€1M
maximum contract amount over 8 months — what was paid on it is not published
Signed on 4 September 2025 · ended around May 2026 · 8 months

Who won it

GTM Sud Ouest TP GCConstruction d'ouvrages d'art · registered office Toulouse (31100) · headcount 100 to 199 employees · SIREN 501401475

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Ecs. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 54 by amount of the 257 contracts Montpellier Méditerranée Métropole published for 2025.

Other contracts of GTM Sud Ouest TP GC in Montpellier Méditerranée Métropole

Construction d’un équipement de téléskis nautiques…2025 · maximum over 6 months948€kCréation passerelle piétons vélo entre pérols et carnon…2023 · maximum over 6 months2.5€MRm5 cournonsec recalibrage de la chaussée construction d’un ouvrage…2021 · maximum over 5 months397€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 3

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.