Skip to main content

Public contracts of Montpellier Méditerranée Métropole · 2023

Travaux de réhabilitation du centre aquatique Neptune à Montpellier lot : 02-Fondations spéciales / Gros œuvre / Maçonnerie

€6.3M
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 27 November 2023 · ended around April 2026 · 2.5 yrs

That is at most ~€2.6M a year on average: a maximum too.

Company selected

Soc TroiselFabrication de structures métalliques et de parties de structures · registered office Helette (64640) · headcount 100 to 199 employees · SIREN 396420119

A contract awarded to a consortium of 3 holders; above, the main holder. With it: Sogea Sud Bâtiment. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 20 by amount of the 270 contracts Montpellier Méditerranée Métropole published for 2023.

Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 27

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.