Travaux de renforcement du réseau d’eaux usées rue mas st pierre a georges Auric

€2.3M
maximum contract amount over 14 months — what was paid on it is not published
Signed on 5 November 2020 · ended around January 2022 · 14 months

That is at most ~€2M a year on average: a maximum too.

Company selected

Sogea Sud HydrauliqueConstruction de réseaux pour fluides · registered office Perols (34470) · headcount 100 to 199 employees · SIREN 327745394

A contract awarded to 2 holders; above, the main holder. With it: Ehtp. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 38 by amount of the 290 contracts Montpellier Méditerranée Métropole published for 2020.

Other contracts of Sogea Sud Hydraulique in Montpellier Méditerranée Métropole

Réhabiliation eaux usées et création d’un poste de refoulement route…2022 · maximum over 10 months1.8€MÉquipements et génie civil associé2021 · maximum over 5 months902€kRenouvellement du réseau unitaire et du réseau d’adduction d’eau…2021 · maximum over 5 months529€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 2