Public contracts of Orléans Métropole · 2020
Ms86-travaux de rénovation du mur du jardin des plantes a Orléans
€65k
maximum contract amount over 3 months — what was paid on it is not published
Who won it
Sefa SARLTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Jargeau (45150) · headcount 3 to 5 employees · SIREN 440692275Number 192 by amount of the 228 contracts Orléans Métropole published for 2020.
Other contracts of Sefa SARL in Orléans Métropole
Travaux pour les opérations comprises entre 0 et 50 000€HT2025 · maximum over 3.5 years515€kMaçonnerie pierre de taille béton armé2021 · maximum over 4 years800€kGros oeuvre2020 · maximum over 6 months276€kContract details (procedure, price, amendments, lots)
Procedure : Appel d'offres ouvert
Price : Ferme et actualisable
Published amendments : 3
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.