Skip to main content

Public contracts of Saint-Etienne Métropole · 2020

Construction d’un bassin de stockage-restitution de 1 300 m3-Boulevard Sagnat

Roche La Molière

€1.3M
maximum contract amount over 7 months — what was paid on it is not published
Signed on 20 November 2020 · ended around June 2021 · 7 months

Who won it

Entreprise BrunelConstruction d'autres bâtiments · registered office Savigneux (42600) · headcount 20 to 49 employees · SIREN 885650564

Number 3 by amount of the 148 contracts Saint-Etienne Métropole published for 2020.

Other contracts of Entreprise Brunel in Saint-Etienne Métropole

Travaux pour le doublement et la réhabilitation du Réservoir du Vernay…2024 · maximum over 15 months405€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.