Skip to main content

Public contracts of Saint-Etienne Métropole · 2020

Travaux aménagement du boulevard fraissinette tronçon schweitzer-gambon et tronçon gambon-metare

€794k
maximum contract amount over 7 months — what was paid on it is not published
Signed on 9 March 2020 · ended around October 2020 · 7 months

Who won it

Eurovia Drome Ardeche Loire AuvergneConstruction de routes et autoroutes · registered office Saint-Jean-Bonnefonds (42650) · headcount 500 to 999 employees · SIREN 317975910

Number 4 by amount of the 148 contracts Saint-Etienne Métropole published for 2020.

Other contracts of Eurovia Drome Ardeche Loire Auvergne in Saint-Etienne Métropole

Enduits superficiels d’usure et d’enrobés à émulsion…2026 · maximum over 4 years2.5€MTravaux pour l’aménagement des rues et places de Tarentaize2026 · maximum over 13 months870€kMarché subséquent n°2 issu de l’accord-cadre 2025VO214-Travaux…2025 · maximum over 12 months2.5€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.