Skip to main content

Public contracts of Tours Métropole Val de Loire · 2025

Maîtrise d’œuvre transfert EU savonnieres + renouvellement réseaux ballan

€327k
maximum contract amount over 5 years — what was paid on it is not published
Signed on 3 July 2025 · running until about July 2030 · 5 yrs
Ongoing3 Jul 2030

That is at most ~€65k a year on average: a maximum too.

Company selected

Setec HydratecIngénierie, études techniques · registered office Paris (75012) · headcount 200 to 249 employees · SIREN 301392569

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Vincent Gauthier Architecte. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 84 by amount of the 275 contracts Tours Métropole Val de Loire published for 2025.

Other contracts of Setec Hydratec in Tours Métropole Val de Loire

TMVL | Étude eau pluviale | 12025 · maximum over 4 years400€kÉtudes gestion eaux pluviales + de connexion réseaux JLT2025 · maximum over 4 years180€kTours | 2019- shéma dir EP | 1-Étude de schéma directeur pluvial2021 · maximum over 3 years500€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.