Public contracts of Le Lamentin · 2021 · Construction and buildings

Pose de constructions modulaires pour des associations et écoles de la ville du Lamentin

Construction d’un modulaire à BELEME

€26k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 15 October 2021 · ended around December 2021 · 2 months

Company selected

Bimini Construction MartiniqueConstruction d'autres bâtiments · registered office Sainte-Luce (97228) · headcount 10 to 19 employees · SIREN 499669992

Number 66 by amount of the 105 contracts Le Lamentin published for 2021.

Other contracts of Bimini Construction Martinique in Le Lamentin

Gros œuvre2025 · maximum over 2 months105€kTravaux de fourniture et pose de constructions modulaires a l’école…2025 · maximum over 1 month105€kConstruction modulaire a long-pré2021 · maximum over 3 months53€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.