Skip to main content

Public contracts of Le Mesnil-Saint-Denis · 2021 · Construction and buildings

Construction d’un accueil collectif de mineurs

€370k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 7 May 2021 · ended around June 2022 · 13 months

That is at most ~€342k a year on average: a maximum too.

Company selected

SommaTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Remy-Les-Chevreuse (78470) · headcount 20 to 49 employees · SIREN 414705053

Number 7 by amount of the 20 contracts Le Mesnil-Saint-Denis published for 2021.

Other contracts of Somma in Le Mesnil-Saint-Denis

Somma-Réhabilitation et extension GS Bois du Fay2026 · maximum over 4 months317€kRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months1.3€MRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months682€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.