Public contracts of Le Mesnil-Saint-Denis · 2021 · Construction and buildings
Construction d’un accueil collectif de mineurs
That is at most ~€342k a year on average: a maximum too.
Company selected
SommaTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Remy-Les-Chevreuse (78470) · headcount 20 to 49 employees · SIREN 414705053Number 7 by amount of the 20 contracts Le Mesnil-Saint-Denis published for 2021.
Other contracts of Somma in Le Mesnil-Saint-Denis
Somma-Réhabilitation et extension GS Bois du Fay2026 · maximum over 4 months317€kRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months1.3€MRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months682€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : 2
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.