Supplier of Le Mesnil-Saint-Denis · Construction and buildings
Somma
Somma holds 5 public contracts awarded by Le Mesnil-Saint-Denis between 2021 and 2026. That is 7% of the value of the contracts the town awarded over the period.
head office in Saint-Remy-Les-Chevreuse (78) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 414705053
Its contracts in Le Mesnil-Saint-Denis
Maximum amount of each contract, over its whole term: not what was paid.
Somma-Réhabilitation et extension GS Bois du Fay2026 · maximum over 4 months · Simplified procedure€317kRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months · at most ~€876k a year on average · Open tender€1.3MRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months · at most ~€455k a year on average · Simplified procedure€682kSomma-Réhabilitation et extension GS Bois du Fay2024 · maximum over 18 months · at most ~€132k a year on average · Simplified procedure€197kConstruction d’un accueil collectif de mineurs2021 · maximum over 13 months · at most ~€342k a year on average · Simplified procedure€370kYear by year
€€370k in 2021 · €€2.2M in 2024 (the highest) · €€317k in 2026
Click a year to see its amount.
Elsewhere in France
Somma holds contracts in 17 towns, worth €11.5M at award.