Supplier of Montigny-le-Bretonneux · Construction and buildings
Somma
Somma holds 2 public contracts awarded by Montigny-le-Bretonneux in 2024. That is 2% of the value of the contracts the town awarded in 2024.
head office in Saint-Remy-Les-Chevreuse (78) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 414705053
Its contracts in Montigny-le-Bretonneux
Maximum amount of each contract, over its whole term: not what was paid.
Gros-oeuvre / Structure2024 · maximum over 12 months · Simplified procedure€170kTravaux de réhabilitation énergétique de la crèche Comtesse de SegurGros-oeuvre / Structure · 2024 · maximum over 12 months · Simplified procedure€170kElsewhere in France
Somma holds contracts in 17 towns, worth €11.5M at award.