Skip to main content

Public contracts of Le Mesnil-Saint-Denis · 2024 · Construction and buildings

Somma-Réhabilitation et extension GS Bois du Fay

€197k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 31 May 2024 · ended around November 2025 · 18 months

That is at most ~€132k a year on average: a maximum too.

Company selected

SommaTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Remy-Les-Chevreuse (78470) · headcount 20 to 49 employees · SIREN 414705053

The competition

2 bids received

Median for this procedure in 2024: 3 bids, across 48728 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 13 by amount of the 22 contracts Le Mesnil-Saint-Denis published for 2024.

Other contracts of Somma in Le Mesnil-Saint-Denis

Somma-Réhabilitation et extension GS Bois du Fay2026 · maximum over 4 months317€kRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months1.3€MRéhabilitation et extension du groupe scolaire Bois du Fay2024 · maximum over 18 months682€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 5

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.