Skip to main content

Public contracts of Lyon · 2026 · Construction and buildings

École élémentaire Jean Racine

Réhabilitation · Plâtrerie · Faux plafonds

€164k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 23 February 2026 · running until about September 2027 · 19 months
Ongoing24 Sept 2027

That is at most ~€104k a year on average: a maximum too.

Company selected

RavaltexTravaux de peinture et vitrerie · registered office Vaulx-En-Velin (69120) · headcount 50 to 99 employees · SIREN 379163785

Number 257 by amount of the 542 contracts Lyon published for 2026. It belongs to the policy Schools.

Other contracts of Ravaltex in Lyon

Travaux sur le patrimoine secteur 5-9 et rive droite2026 · maximum over 4 years6.8€MGroupe scolaire Pompidou2026 · maximum over 18 months679€kMairie du 9e arrondissement2026 · maximum over 15 months60€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.