Public contracts of Lyon · 2020 · Construction and buildings
Établissement accueillant de jeunes enfants les P tits Pas restructuration
Démolition gros oeuvre
Company selected
Harrault MaconnerieTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Chapelle-Villars (42410) · headcount 10 to 19 employees · SIREN 498355460Number 310 by amount of the 382 contracts Lyon published for 2020.
Other contracts of Harrault Maconnerie in Lyon
Groupe Scolaire Claudius Berthelier2024 · maximum over 18 months84€kMusée d’art contemporain2019 · maximum over 9 months114€kMutualisation des postes de police des 7e et 8e arrondissements2019 · maximum over 4.5 years106€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : 4
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.