Public contracts of Lyon · 2024 · Construction and buildings

Groupe Scolaire Claudius Berthelier

Rénovation toitures et façades

€84k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 4 October 2024 · ended around April 2026 · 18 months

That is at most ~€56k a year on average: a maximum too.

Company selected

Harrault MaconnerieTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Chapelle-Villars (42410) · headcount 10 to 19 employees · SIREN 498355460

Number 415 by amount of the 625 contracts Lyon published for 2024. It belongs to the policy Schools.

Other contracts of Harrault Maconnerie in Lyon

Établissement accueillant de jeunes enfants les P tits Pas…2020 · maximum over 11 months50€kMusée d’art contemporain2019 · maximum over 9 months114€kMutualisation des postes de police des 7e et 8e arrondissements2019 · maximum over 4.5 years106€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 3

Subcontracting declared : yes

Environmental considerations : Critère environnemental

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.