Public contracts of Lyon · 2025 · Construction and buildings

Groupe Scolaire Alphonse Daudet

Réhabilitation · Gros œuvre · Maçonnerie · Flocage

€326k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 23 December 2025 · running until about December 2027 · 2 yrs
Ongoing24 Dec 2027

That is at most ~€163k a year on average: a maximum too.

Company selected

MGC ConstructionsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Martin-La-Plaine (42800) · headcount 20 to 49 employees · SIREN 827933078

Number 213 by amount of the 558 contracts Lyon published for 2025. It belongs to the policy Schools.

Other contracts of MGC Constructions in Lyon

Groupe scolaire Jean de la Fontaine2026 · maximum over 3.5 years489€kGroupe scolaire et Eaje les dahlias2026 · maximum over 12 months391€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 6

Subcontracting declared : yes

Social considerations : Critère social

Environmental considerations : Critère environnemental

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.