Skip to main content

Public contracts of Lyon · 2025 · Energy

Groupe scolaire jules verne

Rénovation énergétique Bâtiment A · Courants forts courants faibles

€76k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 25 June 2025 · running until about December 2026 · 18 months
Ongoing25 Dec 2026

That is at most ~€51k a year on average: a maximum too.

Company selected

Bleu ÉlectriqueTravaux d'installation électrique dans tous locaux · registered office Villeurbanne (69100) · headcount 10 to 19 employees · SIREN 400312245

Number 412 by amount of the 558 contracts Lyon published for 2025. It belongs to the policy Schools.

Other contracts of Bleu Électrique in Lyon

Groupe scolaire Jean de la Fontaine2026 · maximum over 3.5 years960€kRemplacement système de sécurité incendie2026 · maximum over 3 months29€kMusée Imprimerie2025 · maximum over 19 months794€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 3

Environmental considerations : Critère environnemental

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.