Public contracts of Lyon · 2022 · Construction and buildings
Groupe scolaire Nérard
Construction · Parements de façades · ITE
That is at most ~€405k a year on average: a maximum too.
Company selected
SAS NebihuTravaux de plâtrerie · registered office Neyron (01700) · headcount 50 to 99 employees · SIREN 522604644A contract awarded to 2 holders; above, the main holder. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 131 by amount of the 506 contracts Lyon published for 2022. It belongs to the policy Schools.
Other contracts of SAS Nebihu in Lyon
Groupe scolaire Ginkgo2021 · maximum over 22 months476€kGymnase des Battières2020 · maximum over 9 months122€kCentre Social et Établissement d’Accueil du Jeune Enfant Langlet Santy2019 · maximum over 21 months435€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Mixte
Published amendments : 9
Subcontracting declared : yes
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.