Skip to main content

Public contracts of Lyon · 2024 · Construction and buildings

Plâtrerie

Peinture · Piscine de Vaise · Rénovation énergétique et réaménagement intérieur

€29k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 25 June 2024 · ended around August 2025 · 14 months

That is at most ~€25k a year on average: a maximum too.

Company selected

RavaltexTravaux de peinture et vitrerie · registered office Vaulx-En-Velin (69120) · headcount 50 to 99 employees · SIREN 379163785

Number 602 by amount of the 625 contracts Lyon published for 2024. It belongs to the policy Culture, sport and youth.

Other contracts of Ravaltex in Lyon

Travaux sur le patrimoine secteur 5-9 et rive droite2026 · maximum over 4 years6.8€MGroupe scolaire Pompidou2026 · maximum over 18 months679€kÉcole élémentaire Jean Racine2026 · maximum over 19 months164€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 4

Environmental considerations : Critère environnemental

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.