Skip to main content

Public contracts of Meudon · 2021 · Construction and buildings

Plomberie chauffage ventilation rénovation gs le val phase 1

€45k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 7 June 2021 · ended around December 2021 · 6 months

Who won it

EriTravaux d'installation électrique dans tous locaux · registered office Fontenay-Sous-Bois (94120) · headcount 500 to 999 employees · SIREN 572078905

Number 76 by amount of the 89 contracts Meudon published for 2021.

Other contracts of Eri in Meudon

A rénovation et extension de l’école élémentaire ferdinand buisson2025 · maximum over 15 months207€kRestauration et aménagement de la chapelle saint-georges2023 · maximum over 14 months10€kRénovation du groupe scolaire LE VAL2021 · maximum over 3 months42€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.