Communauté de communes du Pays Morcenais · Landes · Nouvelle-Aquitaine · 5,138 residents · Mayor: Paul Carrere
Morcenx-la-Nouvelle
€10.5 million spent in 2025.
€2,042 per resident · Towns of the same size: €1,532
Morcenx-la-Nouvelle’s spending by policy area
Click a line to see what it pays for
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €10.5M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €4M (its accounts).
Click a name to see its contracts
- La Compagnie des Cartes Carburant2 contracts over 1 month to 12 months · 1 of them a framework agreement (maximum envelope)up to €140k
- Mont de Marsan Vehicules Industriels2 contracts over 2 monthsup to €122k
- Delzongle Aquitaine (Novodis)2 contracts over 12 months · 1 of them a framework agreement (maximum envelope)up to €99k
- KLS Vip1 contract over 1 monthup to €82k
- Distribution Materiaux Bois Panneaux - D.M.B.P. (Dispano)2 contracts over 12 months to 2 years · at most ~€36k a year on average · 1 of them a framework agreement (maximum envelope)up to €60k
- Sysco France SAS1 contract over 11 months · framework agreement: maximum envelopeup to €33k
- Quincaillerie Setin4 contracts over 12 monthsup to €31k
29 contracts signed in 2025 · €779k before tax · 1 contract (€70k) left out of the total: a copied or out-of-scale ceiling, or a duplicate publication · All contracts
What the town paid in 2025 for these kinds of purchase, from its accounts
- Fuelall suppliers together · contract in the list: La Compagnie des Cartes Carburantpaid €70k
- Food (canteens, nurseries)all suppliers together · contract in the list: Sysco France SASpaid €125k
- Vehicle purchasesall suppliers together · contract in the list: Mont de Marsan Vehicules Industrielspaid €146k
The accounts say how much was paid for each kind of purchase, not to which company. A purchase paid by another public body (joint order, shared service) is not in them.
Why this total differs from the €4M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€1.9M of capital spending in 2025 (building, renovation, equipment), €371 per resident. Towns of the same size: €372.
Click a building site to see the contract
- Installations de chantier, gros œuvre et démolitions2024 · Destruhaut€158k
- Construction d’un pumptrack2023 · PG Construction (PG Concept)€107k
- Construction d’un structure petite enfance MAM+ micro crèche2023 · Health and social care · Larbre Ingenierie€99k
- Rénovation du revêtement de sol du fronton2023 · Lafitte TP (Bautiaa TP)€59k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €9.6M · borrowing: €750k · spending: €10.5M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 1,216 towns of 5,000 to 10,000 inhabitants.
Who spends for the residents of Morcenx-la-Nouvelle
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownMorcenx-la-NouvellePrimary schools, canteens, local streets, civil registry€2,042 per resident
- IntercommunalityCommunauté de communes du Pays MorcenaisWaste, water, urban transport, economic development€448 per resident
- DépartementLandesMinimum income, elderly and disability care, middle schools, county roads€1,269 per resident
- RegionNouvelle-AquitaineHigh schools, regional trains, training, business support€519 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 5,000 to 10,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Morcenx-la-Nouvelle: to report a figure to correct or add context, write to Qipu.
Compare with Saint-Sever or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source