Public contracts of Nîmes · 2023 · Construction and buildings
Installation et location d’une construction modulaire provisoire a usage de réfectoire a l’école élémentaire emile Gauzy
That is at most ~€31k a year on average: a maximum too.
Company selected
CougnaudFabrication de structures métalliques et de parties de structures · registered office Mouilleron-Le-Captif (85000) · headcount 1,000 to 1,999 employees · SIREN 892298324Number 330 by amount of the 438 contracts Nîmes published for 2023.
Other contracts of Cougnaud in Nîmes
Mediathèque Marc Bernard : Création d’un bâtiment provisoire…2025 · maximum over 9 months550€kInstallation et location d’une construction modulaire a l’école jean…2024 · maximum over 4 years218€kInstallation et location d’une construction modulaire provisoire2024 · maximum over 4 years218€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Mixte
Published amendments : 5
Subcontracting declared : yes
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.