Supplier of Pia · Construction and buildings
GM Structure (Gonzalez Structure Metal)
GM Structure (Gonzalez Structure Metal) holds 2 public contracts awarded by Pia in 2026. That is 9% of the value of the contracts the town awarded in 2026.
head office in Rivesaltes (66) · 20 to 49 employees · Travaux de montage de structures métalliques · SIREN 830838439
Its contracts in Pia
Maximum amount of each contract, over its whole term: not what was paid.
Construction de la crèche et des halles : charpente métallique2026 · maximum over 15 months · at most ~€144k a year on average · Simplified procedure€180kConstruction crèche et hallesBardage · 2026 · maximum over 15 months · at most ~€83k a year on average · Simplified procedure€104kElsewhere in France
GM Structure (Gonzalez Structure Metal) holds contracts in 4 towns, worth €824k at award.