Communauté de communes Corbières Salanque Méditerranée · Pyrénées-Orientales · Occitanie · 11,274 residents · Mayor: Jérôme Palmade
Pia
€14.8 million spent in 2025.
€1,316 per resident · Towns of the same size: €1,688
Pia’s spending by policy area
Click a line to see what it pays for
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €14.8M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €6.8M (its accounts).
Click a name to see its contracts
- Travaux Publics 668 contracts over 2 months to 3 years · at most ~€2.6M a year on average · 1 of them a framework agreement (maximum envelope)up to €3.1M
- Gonzalez1 contract over 15 months · at most ~€732k a year on averageup to €915k
- Etude Realisation Industriel Acoustique (Serial)1 contract over 2 years · at most ~€202k a year on average · contract with other holdersup to €438k
- Entreprise Sempere et Fils1 contract over 5 monthsup to €424k
- GM Structure (Gonzalez Structure Metal)2 contracts over 15 months · at most ~€227k a year on averageup to €284k
- Ste d'Application Peintures-Etancheites Revetements (Saper)1 contract over 15 months · at most ~€216k a year on averageup to €269k
- Axair1 contract over 15 months · at most ~€210k a year on averageup to €263k
33 published contracts · €6.7M before tax
Why this total differs from the €6.8M of purchases, services and works paid to companies
These are the amounts of the contracts signed from 2019 to 2026, over their whole length, not what was paid in 2025. The money paid in 2025 also goes to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€3.1M of capital spending in 2025 (building, renovation, equipment), €272 per resident. Towns of the same size: €363.
Click a building site to see the contract
- Travaux de voirie2024 · Streets and transport · Travaux Publics 66€500k
- Maîtrise d’œuvre de la construction d’une crèche et d’une halle2024 · Health and social care · Etude Realisation Industriel Acoustique (Serial)€438k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €46k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €12.8M · borrowing: €2.9M · spending: €14.8M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 568 towns of 10,000 to 20,000 inhabitants.
Who spends for the residents of Pia
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownPiaPrimary schools, canteens, local streets, civil registry€1,316 per resident
- IntercommunalityCommunauté de communes Corbières Salanque MéditerranéeWaste, water, urban transport, economic development€479 per resident
- DépartementPyrénées-OrientalesMinimum income, elderly and disability care, middle schools, county roads€1,294 per resident
- RegionOccitanieHigh schools, regional trains, training, business support€542 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 10,000 to 20,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Pia: to report a figure to correct or add context, write to Qipu.
Compare with Argelès-sur-Mer or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source