Skip to main content

Public contracts of the Bourgogne-Franche-Comté region · 2021

Réfection de l’escalier extérieur

Site Libération · Déconstruction · Gros-œuvre · Maçonnerie

€80k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 31 May 2021 · ended around September 2021 · 4 months

Who won it

Maconnerie Construction CharolaiseTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Vitry-En-Charollais (71600) · headcount 20 to 49 employees · SIREN 350554747

The competition

3 bids received

awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 286 by amount of the 520 contracts the Bourgogne-Franche-Comté region published for 2021.

Other contracts of Maconnerie Construction Charolaise in Bourgogne-Franche-Comté

Montceau-les-mines : Lycée Parriat2024 · maximum over 2 months175€k71 Davaye Mise en accessibilité Phase 1 et 2-Gros œuvre2022 · maximum over 8 months140€kRestructuration de l’atelier viticole2020 · maximum over 10 months78€k
Contract details (procedure, price, amendments, lots)

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.